Tel:
+86-531-82318516

中文 英文
MY POSITION:HOME > News > News
News

News

Three treatment methods for deformation of construction formwork plywood

2018-09-04 10:31:12

 Three treatment methods for deformation of construction formwork plywood

The construction formwork plywood is a temporary support structure. It is made according to the design requirements, so that the concrete structure and components can be shaped according to the specified position and geometrical dimensions, maintaining the correct position of the support, bearing the self-weight and acting on it. And this template will be affected by various factors and deformation. So, how should we deal with this problem?
1. In the design of building formwork plywood and supporting system, full consideration should be given to its own weight, construction load, concrete self-satisfaction and lateral pressure generated during concrete pouring to ensure sufficient bearing capacity, rigidity and stability of the plywood formwork and support. And pay attention to the support spacing of the beam bottom should ensure that no deformation occurs under the weight of concrete and construction plywood load. If the bottom of the support is soil foundation, it should be carefully strengthened first, set up drainage ditch, and lay long pad or steel bar to ensure the support.
2. When constructing the wood formwork and plywood formwork, the concrete should be poured in time after acceptance to prevent the wooden plywood formwork from being exposed to the sun for a long time.
3. For cast-in-place reinforced concrete beam slabs with a span of not less than 4 m, the building formwork shall be arched according to the design requirements. When there is no specific requirement for the design, the arching height shall be 1 / 1000 - 3 / 10 of the span. In addition, when assembling small steel molds, the joints should be placed as specified, and the spacing and specifications of the purlins and tension bolts should be in accordance with the design requirements.